Project Description

Construction of concrete slab 12 “ thick complete with two mats of 15MM reinforcing, concrete walls to be 3 feet high around the entire perimeter of Tank Farm.

Baker Hughes to place 8 tanks with a capacity of 550 barrels, and 6 tanks with a capacity of 625 barrels for there chemical operations. A Hazgard 635 FR Liner was installed under entire slab in order to qualify for PTMMA Guidelines.

Specifications

LocationNisku, AB

Duration2 months

Size6,700 SF Concrete Slab

TypeLump Sum Contract