End Of The Roll
Project Description
The new End of the Roll building is a one storey Industrial building located on Parsons Road in Edmonton. The building will include a sales area, as well as storage and racking for the flooring products sold. There will be a mezzanine area for the offices. The back of the building will be warehouse space with 1 loading dock door, and 1 ground level receiving door. The building will be structural steel framed with an EPDM roof. Exterior finishes include large store front windows, masonry and metal siding. The anticipated completion of this project is July 2020.This project will be the 4th building completed for End of the Roll.
Specifications
LocationEdmonton, AB
Duration8 months
Size18,428 square feet
Type CCDC-2 / Lump Sum Tender