Mill Creek Carwash
Project Description
Canbian has been selected to be the General Contractor for this south Edmonton single storey commercial carwash development totalling 14,035sqft. Construction started on August 21st and is anticipated to be completed for February 28th, 2018. Building composition is made up of cast in place concrete strip footings and foundation walls which support the Conform Stay-in-Place concrete wall forming system (by NuForm). The roof structure consists of precast concrete Hollow-core and Double-tee members with a EPDM roof membrane. Interior finishes included Reline panels (by NuForm), painted drywall, t-bar ceilings, exposed Hollow-core and Double-tee’s, and a concrete slab on grade.
Specifications
LocationEdmonton, AB
Duration6 months
Size14,035 square feet
TypeCompetitive Tender / Lump Sum Contract