Royal Centre Cameron Heights
Project Description
Canbian Inc. is the construction manager for this project which consists of three new CRU buildings located on the same site. The buildings’ footprints range from 10,225 square feet to 3,892 square feet. The foundations for all three buildings will consist of engineered steel screw piles, concrete grade beams and a slab on grade. The buildings are conventional structural steel with EIFS, stone and metal cladding on steel stud / gypsum board walls. An EPDM roofing membrane completes the building’s envelope. The lot will also include a public amenity fountain. Construction commenced in October 2018 and completion is expected for October 2019.
Specifications
LocationEdmonton, AB
Duration12 months
Size18,000 square feet
TypeConstruction Management