Silverberry CRU
Project Description
Canbian Inc. is the construction manager on the Silverberry project. This project is a two storey commercial building, main floor 18,000 square feet, second floor 10,600 square feet. Exterior finishes include masonry, EIFS and metal cladding, roofing is ballasted 60 mil EPDM. The structure is steel stud on structural steel, concrete grade beam on screw piles. The land usage and building location is affected by the utility easement along the east side of the property.
Specifications
LocationEdmonton, AB
Duration12 months
Size28,600 square feet
TypeConstruction Management